Source Page · Updated October 2026

Manufacturing facts buyers can check

This page brings together the facts, project records, process evidence and named contacts behind Yuda Molding's website claims. Project-specific limits are confirmed during drawing and DFM review.

Founded 1997Longkou, ShandongISO 9001:2015North American project support
Company record

Documented company facts

These figures are already used in Yuda's company materials. They describe the business as a whole, not a promise that every project will follow the same schedule or specification.

1997Year founded in Longkou
10,000+Molds delivered across industries
10+Countries served through export supply
ISO 9001:2015Quality management system stated by Yuda
Legal and trading identityLongkou Yuda Molding Co., Ltd.; the website uses the shorter name Yuda Molding Co., Ltd.
Factory locationLongkou, Shandong, China.
Core workDFM review, mold design, CNC and EDM machining, mold assembly, sampling, plastic injection molding, inspection, packing and export coordination.
Typical mold lead time30–45 days for standard molds and 45–60 days for complex or multi-cavity molds. Final timing depends on design review, steel, components, sampling and approval rounds.
Export deliverySea freight through Qingdao or Yantai, or air freight when required. Standard documents include packing list, commercial invoice and inspection report.
Best-fit workCustom industrial parts, automotive and RV components, home-appliance parts, pilot runs, and small-to-medium production where the buyer can provide drawings, samples or clear requirements.
Evidence rule: Yuda does not publish customer names or confidential drawings without permission. The case pages use product type, stated requirements, timing and acceptance results from the project records already shown on this website.
Quality inspection work at Yuda Molding
Quality workflow

What is checked before delivery

Inspection is tied to the drawing and approval requirements for each job. The workflow covers incoming material, machining, assembly, trial samples, dimensional checks and final packing.

Review the requirement

Drawing, sample, resin, quantity, appearance and assembly requirements are reviewed before tooling starts.

Check during the build

Machining and mold assembly are checked before the first trial to reduce avoidable rework.

Record sample results

T1 samples, critical dimensions and requested corrections are recorded for the next approval round.

Project evidence

Published case records

Each page separates the requirement, the manufacturing challenge and the recorded outcome so buyers and search systems can cite the relevant facts directly.

Turnover container mold and molded product

Turnover Container Mold

Sample-based replacement project. 30-day delivery record and 100,000-shot requirement.

Read documented case →
EV motor housing mold project

EV Motor Housing Mold

Drawing-based project focused on body fit, delivery timing and first-submission acceptance.

Read documented case →
Washing machine control panel mold project

Washing Machine Control Panel

25-day project with a one-million-shot mold-life requirement and critical-dimension inspection.

Read documented case →
Named contacts

People behind project enquiries

These are public business contacts. Their LinkedIn profiles are linked as independent identity references rather than being presented as company profiles.

Need a project-specific answer?

Send a drawing, sample photo, resin, target quantity and application notes for review.

Send project information