1. Requirement
Reverse-develop the mold from the customer's physical sample, hold the existing product dimensions, and reach the first production shot within the 30-day project window.
The customer needed a logistics container that could replace the existing product without changing the surrounding system. The recorded project requirements were a 30-day delivery window and a minimum mold-life target of 100,000 shots.

Yuda developed an injection mold from the supplied product sample and delivered it within the recorded 30-day window. The molded container matched the required dimensions, passed customer acceptance and entered production as a compatible replacement.
| Input | Existing product sample |
|---|---|
| Application | General industrial logistics container |
| Delivery record | Within 30 days |
| Mold-life requirement | 100,000 shots minimum |
| Recorded result | Accepted and placed into production |
Reverse-develop the mold from the customer's physical sample, hold the existing product dimensions, and reach the first production shot within the 30-day project window.
The replacement part had to fit the customer's existing logistics system. A visibly similar container was not enough; its main interfaces and overall dimensions had to remain compatible.
The mold was delivered within the stated window. The resulting container met the dimensional requirements, was confirmed as a drop-in replacement and passed customer acceptance.
When drawings are incomplete, a physical sample can support an initial feasibility review. Critical interfaces still need to be identified and agreed.
The RFQ should identify the dimensions, mating surfaces and use conditions that determine whether a replacement is truly compatible.
A short schedule works only when design questions, mold details and sample feedback are answered quickly by both sides.
Send photos, main dimensions, resin, quantity and the required interfaces for review.