Everything you need to evaluate whether we're the right fit for your project — before you send the first email.
在发送第一封邮件之前,您需要了解的一切,以评估我们是否适合您的项目。
Our shop floor runs a mix of precision machines for mold-making and high-tonnage injection molding.
我们的车间配备精密模具加工设备和大型注塑机。
| Equipment | Model / Spec | Qty | Notes |
|---|---|---|---|
| CNC Machining Center | CY-M1580, VMC1060 | 2 | Cavity & core machining, ±0.01mm |
| EDM (Sinker) | BM850/AP50, DM540, DB7145, BM50/AP50, DM450 |
5 | Precision cavity features |
| Wire EDM | DK7750Z, DK7740Z | 5 | Complex profiles & inserts |
| Injection Molding Machine | 88T – 1,500T (Horizontal) / 4T – 20T (Vertical) | 20 | 11 horizontal + 9 vertical machines |
| Surface Grinder | M7130A | 1 | Mold plate finishing |
| Inspection Equipment | Micrometers (8), Calipers (14), Dial indicators (10), Bore gauges (10), Optical comparator (1) | 23 tools | Full-process QC |
The ranges we work within — from small precision parts to large structural components.
我们可制造的范围——从小型精密零件到大型结构件。
These are the areas where we consistently outperform expectations.
这些是我们持续超越期望的领域。
You have a design, or even just a concept. We help you get to a working mold with DFM support included.
您有设计,甚至只是一个概念。我们帮您完成可用模具,包含DFM支持。
We work well with teams ordering 500–50,000 parts. No pressure to commit to volume before you're ready.
我们与订购500-50,000件的团队合作愉快。在您准备好之前,没有批量承诺的压力。
Your design might change. We're set up for that — revisions within our DFM feedback scope are included.
您的设计可能会变更。我们为此做好准备——DFM反馈范围内的修改均包含在内。
ISO 9001:2015 certified. Every mold and part is verified before it leaves our facility.
ISO 9001:2015 认证。每一套模具和零件在出厂前均经过检验。

"We inspect all incoming steel and resin against material certs."
"我们对所有进厂的钢材和树脂进行材料证书核对检验。"

"Every first sample is measured against drawing specs and documented."
"每个首件样品都按照图纸规格进行测量并记录。"

"We check dimensions at regular intervals during production runs."
"我们在生产过程中定期检查尺寸。"

"100% visual check + dimensional sampling before packaging."
"包装前进行100%目视检查+尺寸抽检。"

"Final verification against packing list before goods leave our factory."
"货物出厂前对照装箱单进行最终核对。"
We handle the full journey — from our factory door to yours.
我们负责全程物流——从我们工厂到您手中。
Typically 30–45 days for standard molds. 45–60 days for complex / multi-cavity.
标准模具通常30-45天,复杂/多腔模具45-60天。
30–60 Days 30–60 天Sea (Qingdao / Yantai Port) or Air.
海运(青岛/烟台港)或空运。
Sea & Air 海运 & 空运Packing list · Commercial invoice · Inspection report.
装箱单 · 商业发票 · 检验报告。
Full Docs 全套单证Wooden crate, rust-prevention oil, foam protection.
木箱、防锈油、泡沫保护。
Protected 防护包装Mold storage, periodic maintenance, revision support.
模具存储、定期维护、修模支持。
Ongoing 持续支持Send us the drawing — we'll give you honest feedback within 48 hours.
发送图纸给我们——我们将在48小时内给您真实反馈。