1. Requirement
Meet a short 25-day schedule, hold the critical dimensions on the drawing and build for the stated one-million-shot production requirement.
The recorded project targets were a 25-day delivery window, critical dimensions that had to meet the drawing and a one-million-shot mold-life requirement for production.

The mold was delivered within the recorded 25-day window. The critical dimensions passed inspection, and production ran at the target cycle time stated in the project record.
| Part | Washing machine control panel |
|---|---|
| Application | Home appliance interface |
| Delivery record | Within 25 days |
| Mold-life requirement | 1,000,000 shots |
| Recorded result | Dimensions passed; target cycle time reached |
Meet a short 25-day schedule, hold the critical dimensions on the drawing and build for the stated one-million-shot production requirement.
The panel needed clean fit with the appliance body. Thin-wall features required stable filling, controlled shrinkage and repeatable visible quality.
The mold was delivered within the project window. Critical dimensions passed inspection, and the production process reached the target cycle time.
Specify visible areas, gap requirements, fastening features and the surfaces that mate with the appliance body.
Material grade, color, texture and shrinkage affect both appearance and fit. They should be fixed before the mold design is released.
A mold-life target should be connected to steel choice, expected annual volume and a practical maintenance plan.
Send the drawings, resin, appearance standard, annual quantity and assembly notes.